Installing Fundo in concrete floor - alternative

   There are situations where it is appropriate to use wedi Tilebacker board to cover the whole floor area. This may be because of the condition of an existing floor or where the heat insulating properties of Tilebacker are important for the performance of the completed tiled area.

   In this case, a smaller aperture is required.

   Site the drain unit in the exact location for both height and position for later connection to the Fundo base element. Check all joints are tightened.

   Fill the void around the drain and pipework with a suitable mortar. Compress and level out the whole area to the top of the drain body.

  Follow the instructions for finishing the installation.