|
|||
Installing Fundo Pentagon Step 2
|
|||
|
PU or hybrid sealing compound is applied to
the edge of the board or the U profile before it is installed.
The shower partitions are offered up to the U-profiles. The joints are covered with reinforcing tape on the outside and waterproof sealing tape on the wet side. The U profiles and screws are included in every Fundo kit that is supplied. Adequate time must be allowed for the adhesive on the joints to set before tiling is commenced. |
|