The first stage of tiling
is to install the grid support frame(right). The extension collar
should be cut to length if it is required to compensate for the
thickness of the tiles or stone.
Apply cement-based flexible adhesive
to the top surface of the Fundo. Make sure that the corners of the
grid support align with the corners of the Fundo.
Apply more adhesive and commence tiling (below).
That concludes the installation sequence for wedi
Fundo.