Wedi transforms the work of tiling

Installing Fundo in wooden floor step 1

   Before starting work, the floor must be adequately stiff, with reference made to the appropriate construction standards for the rigidity of such a floor for tiling.

   The first stage is to cut out a section of floor in order to install the drain unit (right).

Then, 80mm below the top of the joist, firmly fix noggins and a support board between the joists on which to bed the Fundo drain body firmly (below).
Hole prepared in firm floor

Support board and noggins 80mm below top of joist